HDB Singapore BIM Guide v.2


[1]
The HDB SG BIM [2] guide was produced by the Housing and Development Council (HDB) and the Building Authority (BCA) in Singapore, released in 2015 as version 2.0. The purpose of the document is to assist Consultants and Contractors in developing BIM models for new housing estates in Singapore. It specifies BEP requirements and guidelines for PIM and AIM for HDB projects. For those not interested in the legislation of this country, the guide may be helpful in such areas as: minimum requirements for BIM implementation and modeling, basic information about models, steps and procedures for creating architectural, structural and MEP models. Part II of the guide in particular is a graphical guide to the basic concepts of building information modeling. The document consists of part II:




Start modeling: design template, transfer information from basic templates, create base model and other models;
Modeling plan: project split, file sharing, Revit server;
Architecture model: conceptual design, preliminary design, detailed design;
Model Construction: preliminary design, detailed design;
MEP models: conceptual design, preliminary design, detailed design;

The BEP according to the HDB handbook template should include, inter alia:

  • Project information
  • BIM goals for the project
  • BIM use cases at every stage of the project
  • BIM products for every BIM use case
  • Roles, responsibilities and competences of project members
  • BIM process and strategy
  • BIM exchange protocols and transfer format
  • BIM data requirements
  • Collaboration procedures and methods of handling shared models
  • Quality control
  • Technological infrastructure and programming
  • Other

MEP classification:

[M] MECHANICAL - Ventilation installation : Fresh air duct [FAD]; Supply air duct [SAD]; Fresh air duct in the kitchen [KFAD]; Exhaust air duct from the kitchen [KEAD]; Extract air duct [EAD]; Return air duct [RAD]; Toilet exhaust air duct [TEAD]; Return air duct to toilet [TRAD]; Condensed water supply [CWS]; Condensed water return [CWR];

[E] Electrical installation: Electric cables [ECAB]; Telecommunications [TELECOM]; Cable tray [CTRAY]; Cable ladder [CLAND]; Cable trays [CTRUNK]; Cable housing [CENCLOSE]

[P] PLUMBING - Water supply: cold water supply [CWS]; hot water supply [HWS]; sanitary [SANITARY]; Rainwater drainage pipe [RWDP]; Peszel [HR]; Pion [WR]; Sprinklers [SPR]; Gas [Gas]


Source:
[1] pixabay.com
[2] HDB BIM GUIDE Version 2.0; Housing and Development Board (HDB) and the Building and Construction Authority (BCA); July 2015 - https://www.hdb.gov.sg/cs/infoweb/-/media/doc/BQG/bim-guide-v2.pdf

Comments

Popular Posts